Full Scale 1MW Wave Energy airWAVE™ Turbine Power Take-Off System Demonstration (1)
9月13日 週四
|Guanyin District
Aquanet Power proudly invites you to the viewing of our unique first of its kind, full scale 1 MW airWAVE™ Turbine PTO System demonstration facility. Equipped with capabilities to simulate global wave conditions, we will demonstrate the system output and performance in any given condition.
時間和地點
2018年9月13日 下午12:00 – 下午4:00
Guanyin District, Guanyin District, Taoyuan City, Taiwan 328
關於本活動
This tour is part of the technical tour offered in conjunction with the AWTEC 2018 conference. For delegates who have registered to take part in the tour, you will depart from the NTOU campus after the NTOU technical tour at around 12.00 noon. Buses will depart the NTOU test site at around 12.00 noon. Anticipated arrival at the PTO site in Taoyuan is 1.20pm. The tour will take in total 3.5 hours including travel time. At the end of the tour, buses will depart from the PTO site and drop off at the conference venue in Taipei.