top of page

Full Scale 1MW Wave Energy airWAVE Turbine Power Take-Off System Demonstration

9月12日 週三

|

Guanyin District

Aquanet Power proudly invites you to the viewing of our unique first of its kind, full scale 1 MW airWAVE Turbine PTO System demonstration facility. Equipped with capabilities to simulate global wave conditions, we will demonstrate the system output and performance in any given condition.

Registration is closed for this event.
Thank you
Full Scale 1MW Wave Energy airWAVE Turbine Power Take-Off System Demonstration
Full Scale 1MW Wave Energy airWAVE Turbine Power Take-Off System Demonstration

時間和地點

2018年9月12日 下午2:30 – 下午6:00

Guanyin District, Guanyin District, Taoyuan City, Taiwan 328

關於本活動

This tour is part of the technical tour offered in conjunction with the AWTEC 2018 conference. For delegates who have registered to take part in the tour, please meet at the Aquanet Power exhibition booth at 2.15pm. Buses will depart the conference venue at 2.30pm. Anticipated arrival at the PTO site is 3.30pm. The tour will take in total 3 hours including travel time. At the end of the tour, buses will depart from the PTO site and go directly to the Grand Hotel in Taipei in time for the Closing Banquet.

分享此活動

bottom of page